Steven Wang | WhatsApp: +86 13773267104 info@zjgmodern.com | steven@zjgmodern.com
Modern Machinery logo Modern Machinery Liquid Filling & Packing Systems
Get a Quote
Machine detail page

5 Gallon Filling Machine

5-gallon (18.9 L) water filling machine with jar washing, gravity or flowmeter filling and cap pressing, capacity 100–1,200 JPH.

Container 5-Gallon PC Jar
Jar Volume 18.9 L
Filling Method Gravity / Flowmeter
Main Functions Jar Washing, Filling, Capping
AI-search ready answer

What is a 5 gallon filling machine?

A 5-gallon filling machine fills and caps large PC water jars. Empty jars are washed, filled by gravity or flowmeter to a set volume, and capped with a 5-gallon cap. The line emphasizes jar sanitation and is commonly used for returnable dispenser jars.

18.9 L

5 Gallon Filling Machine
Machine detail source image: 5 gallon filling machine.
Technical specifications

5 Gallon Filling Machine specification checklist

Use the table as an inquiry guide. Exact configuration depends on your product, container, capacity and line integration.

Container 5-gallon PC jar
Jar Volume 18.9 L
Filling Method Gravity / flowmeter
Filling Heads Single or multi
Capacity 100–1,200 JPH
Closure 5-gallon cap
Drive Variable-frequency
Control PLC + touchscreen
Washing Jar washing
Material Food-grade stainless steel
Component logic

Core assemblies buyers should review

Jar Washing

internal and external jar cleaning.

Flowmeter / Gravity Filling

accurate large-volume fill.

Cap Pressing

5-gallon cap application.

Returnable Jar Support

handles PC jars.

Sanitary Design

focuses on jar hygiene.

Food-Grade Construction

stainless-steel contact.

PLC Control

touchscreen operation and alarms.

Engineering and services

How to configure a 5 gallon filling machine project

1

Empty 5-gallon jars are loaded and washed.

2

Jars are filled by gravity or flowmeter to set volume.

3

5-gallon caps are pressed onto the jars.

4

Filled jars are inspected and dated.

5

Jars are stacked or conveyed for storage.

6

Jars proceed to labeling or shrink band.

Media center proof

Video and case modules for this detail page

FAQ for SEO and GEO

5 Gallon Filling Machine FAQ

What is included in a complete bottling line?

A complete line can include water treatment, bottle blowing, air conveyor, rinsing, filling, capping, inspection, labelling, shrink packing, carton packing, conveying and palletizing.

Why choose Modern Machinery as a filling machine supplier?

Modern Machinery combines filling machine manufacturing, customized line configuration, factory capability, quality control, service response, warranty and project support for international buyers.

What happens after I submit the inquiry form?

A project engineer reviews your requirements and replies within one working day with initial questions, machine scope suggestions and next steps for project discussion.

Can I get a FAT video for my own bottle and product?

Yes. After confirming bottle drawing, product type and target capacity, a matched machine test can be arranged and recorded before shipment.

Can this line run multiple bottle sizes?

Yes. The final configuration depends on bottle drawings, cap size, label type and required changeover speed. Change parts are available for different bottle formats.

What is the difference between isobaric and gravity filling?

Isobaric filling pressurizes the bottle to match the filler bowl pressure before filling, which prevents CO2 breakout and foaming. Gravity filling cannot handle carbonated products because the pressure drop causes the CO2 to escape violently.

Can this machine fill carbonated drinks into glass bottles?

Yes. It is designed for carbonated soft drinks such as soda, cola and sparkling beverages in glass bottles, using pressure filling technology.

How do I choose between gravity filling, hot filling and isobaric filling?

Gravity is for still water. Hot filling uses recirculation for juices. Isobaric filling is mandatory for carbonated drinks and beer to prevent gas loss.

Can Modern Machinery provide a customized bottling line solution?

Yes. The company can plan solutions based on liquid type, bottle or can format, target capacity, factory layout and packing requirements.

Does the video show a filler only or a full line?

This video focuses on the filling machine. A complete line adds labeling, packing, water treatment, blending and carbonation depending on the project.

Does the customer need bottle blowing in the same line?

For PET water projects, integrating bottle blowing can reduce bottle logistics and improve line flow when factory space allows it.

What information is needed for a glass bottle filling machine quote?

Provide bottle volume, bottle diameter, bottle height, cap type, target output, beverage type, voltage and whether you need upstream washing or downstream packing.

Can one machine fill both PET and glass bottles?

Some models support quick changeover between PET and glass, but the neck-handling system and capping heads need to be configured for both. We recommend specifying your bottle types upfront so we can supply the right change parts.

Can I talk to an engineer directly?

Yes. After the initial email exchange, a project engineer can connect by WhatsApp, phone or video meeting to discuss machine scope, layout and project details.

What is the typical lead time for a CSD line?

Standard configurations ship in 45-60 days. Custom or high-capacity lines may take 75-90 days for manufacturing plus 15-30 days for sea freight depending on the destination port.

Is glass bottle filling different from PET bottle filling?

Yes. Glass bottles are heavier and often require different bottle handling, guide rails, cap options and infeed/outfeed protection.

What quality support is available before shipment?

Quality support can include manufacturing inspection, machine running test, FAT records, photos, videos and shipment checks.

Can Modern Machinery plan a line layout for my bottle size and capacity?

Yes. Modern Machinery provides customized 2D and 3D plant layout planning tailored to facility dimensions, container type and target BPH.

Do you provide plant layout and machine list before ordering?

Yes. After confirming product, container, capacity and factory dimensions, Modern Machinery can prepare a preliminary layout direction, machine list and budget range for purchasing review.

What should be prepared before installation?

Factory floor plan, power supply, compressed air, water treatment interface, drainage and operator access should be confirmed before shipment.

What capacity does this machine support?

The test reference is 8,000-12,000 BPH; the final speed depends on bottle size, cap type and product.

What after-sales service is provided?

Service can include installation support, maintenance guidance, spare parts support, timely response and warranty service depending on project scope.

Do you provide installation and training?

Yes, our engineers travel to your site for mechanical installation, electrical commissioning, operator training, and production trial runs. We also offer remote video support for ongoing troubleshooting.

What information should I prepare before requesting a quote?

Please prepare your liquid type, packaging vessel, expected BPH, bottle or can size, factory dimensions and local voltage standard.

Can Modern Machinery provide a similar layout?

Yes. A similar project plan can be prepared after the buyer shares product type, bottle size, target capacity and factory dimensions.

Can I visit the factory or see a running line?

Factory visits are welcome. Running line videos and project case references are also available to help you evaluate machine quality and project execution before visiting.

Can this machine be part of a complete carbonated drink line?

Yes. It can be integrated with water treatment, syrup mixing, carbonation, bottle washing, labeling, packing and conveying systems.

Can the line be upgraded later when output increases?

Yes. Modular line planning allows future upstream and downstream upgrades.

What about spare parts availability?

We maintain a comprehensive spare parts inventory and ship express worldwide. Each machine comes with a recommended 12-month spare parts list, and we can also prepare custom spare parts packages based on your production volume.

Start your project

Ready to plan your bottling line?

Tell us your product, container and target capacity. Our engineers will recommend a configuration, prepare a layout and send a quotation.

Request a Quote
Free Consultation
Custom Solution
Fast Turnaround