Steven Wang | WhatsApp: +86 13773267104 info@zjgmodern.com | steven@zjgmodern.com
Modern Machinery logo Modern Machinery Liquid Filling & Packing Systems
Get a Quote
Video Library

Filling machine videos organized by machine, installation, guidance and case proof.

Browse practical video evidence with visible product type, package format, equipment model, capacity, test condition and result summary.

Video library structure

Choose a video category

This page is a clean entrance to the video resources under Modern Machinery. Each category uses the same card format so buyers can quickly compare machine videos, installation videos, technical guidance videos and project case videos.

Machine Videos

Machine videos show actual operation by machine type, filled product, package format and test result. They help buyers confirm whether the equipment matches their target production line.

3 Videos

Carbonated Soft Drink Filling Machine FAT Test

A PET bottle carbonated drink filler under pressure: bottle transfer, isobaric filling, foam control, capping and discharge inspection.

ModelDCGF isobaric filling monoblock
ProductCarbonated soft drink / soda water
Package500ml PET bottle, screw cap
Capacity8,000-12,000 BPH test range

Video timeline

00:00Bottle infeed and starwheel transfer
00:42Isobaric filling and foam control
01:48Capping and finished bottle discharge

Test conclusion

Stable pressure filling, controlled foam and synchronized capping make this video suitable for CSD line review.

Beverage Canning Machine Filling and Seaming Test

Empty can feeding, beverage filling, lid placing, can seaming and final discharge for carbonated or energy drink projects.

ModelDGF can filling and seaming system
ProductCSD / energy drink
Package330ml aluminum can
Capacity12,000-18,000 CPH range

Video timeline

00:00Empty can infeed and rinsing
00:58Filling turret and lid feeding
02:05Seaming and finished can output

Test conclusion

Continuous can transfer, clean lid placement and stable seaming support aluminum can project evaluation.

PET Bottle Water Filling Machine Running Test

Still water bottle transfer, rinsing, gravity filling, capping and finished bottle output for a PET water line.

ModelCGF water rinsing filling capping machine
ProductStill drinking water
Package500ml PET bottle
Capacity12,000 BPH reference

Video timeline

00:00Bottle infeed and rinsing station
01:05Water filling and cap application
02:20Discharge conveyor and output check

Test conclusion

Stable bottle transfer, filling level and cap placement make this a practical water line reference video.

Installation Videos

Installation videos focus on project delivery proof: FAT before shipment, machine positioning, utility connection, commissioning and operator training.

3 Videos

On-site Installation and Commissioning Video

Machine placement, conveyor connection, utility checks and startup support for an overseas bottling project.

ModelTurnkey water filling and packing line
ProductBottled drinking water
PackagePET bottle multipack
Capacity12,000 BPH project reference

Video timeline

00:00Machine placement and line positioning
01:30Conveyor and utility connection
03:12Trial running and operator instruction

Test conclusion

The line is ready for startup when alignment, utility checks, bottle transfer and training are completed.

Factory Acceptance Test Before Shipment

Machine inspection before delivery: assembly review, dry run, wet run and buyer-facing result confirmation.

ModelConfigured filling and packing equipment set
ProductCustomer-specified beverage or water
PackageMatched bottle, can, cap and label samples
CapacityConfirmed against contract target

Video timeline

00:00Machine overview and safety check
01:22Trial running with samples
03:40Result review and packing preparation

Test conclusion

FAT is accepted when scope, product path, output target and test records are confirmed before shipment.

Operator Training and Startup Video

Key startup steps, safety checks, HMI operation and routine observation points after line installation.

ModelFilling line startup support package
ProductWater, CSD, juice or beer
PackagePET, glass bottle or aluminum can
CapacityProject-specific training range

Video timeline

00:00Pre-start safety and utility checks
01:08HMI and machine startup sequence
02:38Operator observation and daily handover

Test conclusion

Training is useful when operators can identify normal running conditions and basic adjustment points.

Technical Guidance Videos

Technical guidance videos turn video material into searchable knowledge: layout planning, machine adjustment, process checks and production handoff.

3 Videos

Production Line Layout Planning Guide

How to review bottle flow, utility interfaces, operator access and expansion space before finalizing a line layout.

ModelTurnkey filling line layout package
ProductWater, CSD, juice, beer or oil
PackagePET, glass bottle or aluminum can
Capacity3,000-20,000+ BPH / CPH

Video timeline

00:00Product and package information
01:15Machine footprint and conveyor path
03:04Utilities, operator space and expansion

Test conclusion

A layout is ready for proposal when process flow, footprint, utilities and operator access are confirmed.

PET Bottle Blowing Machine Setup Guide

Preform feeding, heating, mold movement and bottle discharge checks before connecting to a filling line.

ModelAutomatic PET bottle blowing machine
ProductEmpty PET bottle production
PackageWater or beverage bottle
Capacity4,000-9,000 BPH reference

Video timeline

00:00Preform feeding and heating
01:04Mold closing and blowing action
02:18Bottle discharge and quality check

Test conclusion

The blowing section is ready when bottle shape, wall thickness and discharge stability meet the filler requirement.

Labeling and Packing Adjustment Guide

Label feeding, bottle orientation, label position checking and packing handoff before continuous production.

ModelOPP labeler and shrink packing line
ProductBottled water or beverage
PackagePET bottle with film pack
CapacityMatched to filling line speed

Video timeline

00:00Label roll and glue station check
01:12Bottle orientation and label position
02:22Shrink wrap handoff and output

Test conclusion

Labeling and packing are ready when label alignment, pack transfer and discharge rhythm are stable.

Case Videos

Case videos connect video proof with real customer context: country, industry, beverage type, container format, installed capacity and final production result.

3 Videos

Complete PET Bottle Water Bottling Plant Case Video

A PET water line from bottle handling to finished pack output — a complete layout and operating reference.

ModelBlowing, CGF filler, labeling and packing
ProductStill drinking water
Package500ml and 1.5L PET bottle
Capacity12,000 BPH installed reference

Video timeline

00:00Project overview and machine sequence
01:36Filling, labeling and conveyor flow
03:10Packing section and finished output

Project result

The video proves the full production chain instead of only the filler, making it useful for full water line comparison.

Carbonated Soft Drink Bottling Line Case Video

A CSD filling project with pressure filling, capping, labeling and packing reference for PET or glass bottle formats.

ModelCSD filling, labeling and packing system
ProductCarbonated soft drink
PackagePET or glass bottle
CapacityProject-specific BPH reference

Video timeline

00:00Carbonated beverage process overview
01:06Filling pressure and bottle output
02:44Labeling, packing and final display

Project result

The case helps buyers compare container format, pressure filling stability and downstream packing logic.

Beer Bottling Line Customer Case Video

A beer bottling project with bottle handling, filling, capping or crown sealing, labeling and packing process proof.

ModelBeer filling and packing line
ProductBeer / malt beverage
PackageGlass bottle reference
CapacityConfigured by brewery output target

Video timeline

00:00Bottle preparation and transfer
01:28Beer filling and sealing
03:05Labeling, packing and line acceptance

Project result

The video gives brewery buyers a reference for glass bottle handling, filling stability and finished product flow.

Video FAQ

Before requesting videos

What should a useful equipment video include?

A useful video should identify the machine model, filled product, package specification, capacity, test condition, video timeline and result. This helps buyers compare real operating conditions instead of only watching motion.

Can Modern Machinery provide a video for my bottle or can format?

Yes. Share your product, bottle or can size, cap or lid type and target capacity. The team can recommend a matching video or prepare a FAT video during machine testing.

Why add full text summaries and VideoObject data?

Video summaries and structured data help search engines and AI answer systems understand what the video demonstrates, including tested product, machine type, capacity and result.

Start your project

Ready to plan your bottling line?

Tell us your product, container and target capacity. Our engineers will recommend a configuration, prepare a layout and send a quotation.

Request a Quote
Free Consultation
Custom Solution
Fast Turnaround