Armenia 12,000 BPH PET Bottle Water Line
A complete PET bottle drinking-water line delivered to Armenia: bottle blowing, air conveying, 3-in-1 water filling, labeling and film packing planned as one production system.
Case overview
| Country | Armenia |
|---|---|
| Industry | Bottled drinking water |
| Beverage type | Still water |
| Bottle / container type | 500ml and 1.5L PET bottles |
| Machine model | CGF series 3-in-1 rinsing filling capping monoblock |
| Processing capacity | 12,000 bottles per hour |
| Installation year | 2025 |
What the customer needed to solve
This case page is structured to show the real buying logic behind the project: the production problem, the line configuration and the measurable result after commissioning.
Customer challenge
The customer needed to move from semi-automatic water packing to a stable automatic line while keeping the factory footprint compact and leaving room for future capacity growth.
ALPS solution
Modern Machinery planned a PET water line with bottle blowing, air conveying, 3-in-1 water filling, automatic labeling, film wrapping and commissioning support matched to the customer's bottle sizes.
Quantified result
- Output increased by 38% compared with the previous setup.
- Labor requirement reduced from 12 operators to 7 operators per shift.
- Line acceptance completed after FAT video review and on-site commissioning.
Line configuration from empty bottle to packed product
The project was planned as an integrated water production line rather than isolated equipment. This makes the case page easier for buyers and AI search systems to understand by equipment function.
PET Bottle Blowing
Automatic bottle forming matched to 500ml and 1.5L bottle formats.
Air Conveying
Clean bottle transfer from blowing machine to filling block.
Water Filling
CGF 3-in-1 rinsing, filling and capping monoblock for still water.
Labeling
Automatic label application with bottle size changeover planning.
Film Packing
Shrink wrapping and discharge layout prepared for pallet handling.
Installation timeline
Showing the delivery process helps overseas buyers understand how a case moved from specification to running production.
Requirement Check
Bottle size, cap type, factory dimensions and target output confirmed before layout.
Layout & Machine List
Blowing, filling, labeling and packing equipment selected as one system.
FAT & Shipment
Machine testing and running video review completed before shipment.
Installation Support
Commissioning guidance, operator training and spare parts plan prepared.
Service system: support from layout confirmation to stable production
Modern Machinery supports overseas bottling projects with a practical service process: confirm requirements, prepare the layout, test the machines before shipment, guide installation and keep support available after startup.
Requirement review
Review beverage type, bottle size, cap, label, target capacity, factory dimensions and local utilities before preparing the proposal.
Factory acceptance test
Run key equipment, record test videos and confirm the packing flow before the line leaves the factory.
Commissioning guidance
Support mechanical positioning, electrical checking, line adjustment, operator training and production startup.
Spare parts & support
Prepare recommended spare parts and respond to operating questions as the customer moves into regular production.
Client-facing promise: the service goal is not only to deliver machines, but to help the customer reach stable, repeatable production with a clear line layout, trained operators and an actionable spare parts plan.
Running video, before/after photos and site proof
Use one clear running video to show the finished production line in operation. Buyers can check bottle flow, filling stability, labeling alignment and packing handoff before they request a similar project plan.
Running video: PET bottle water line in operation
This video position should show the line running continuously, from bottle transfer and filling to labeling and final packing. Use the customer's actual running video or a verified FAT video from the same project.
Before / after photos
Factory preparation, machine arrival, installation progress and finished line photos help customers understand project execution and site readiness.
Finished line photos
Completed line overview, operator area, packing discharge and final acceptance record from the same project.
Customer quote
“The line was delivered with a clear layout, and the installation team helped us start stable production faster than expected.”
Plant owner, bottled water producer in Armenia
- Acceptance focus
- Stable filling and packing flow
- Service focus
- Installation and operator training
- Next step
- Reserve space for a higher-capacity packing section
Case FAQ: questions buyers usually ask about this type of project
Can this line run multiple bottle sizes?
Yes. The final configuration depends on bottle drawings, cap size, label type and required changeover speed. Change parts are available for different bottle formats.
Does the customer need bottle blowing in the same line?
For PET water projects, integrating bottle blowing can reduce bottle logistics and improve line flow when factory space allows it.
What should be prepared before installation?
Factory floor plan, power supply, compressed air, water treatment interface, drainage and operator access should be confirmed before shipment.
Can Modern Machinery provide a similar layout?
Yes. A similar project plan can be prepared after the buyer shares product type, bottle size, target capacity and factory dimensions.