Project Workflow from Formula to Installation
Modern Machinery turns product formula, bottle format and target capacity into a filling line layout, machine list, FAT plan, installation schedule and after-sales service plan.
What Technology & Services covers
Technology & Services covers product and bottle analysis, line layout, machine configuration, factory acceptance testing, installation, operator training, spare parts and troubleshooting.
Layout, utilities, packing method and operator training determine how smoothly the line runs after delivery.
Find your project stage
Find the service path that matches your current project stage.
Idea & Budget
Beverage category known; capacity, machine scope and budget not yet defined.
Bottle & Formula Ready
Bottle size, cap type, formula and packaging target ready.
Factory Layout
Need 2D/3D layout, utility planning and machine arrangement.
Installation & Upgrade
Need commissioning, operator training, spare parts or output upgrade.
From formula analysis to installation and training
Formula & Bottle Analysis
Confirm product type, viscosity, carbonation, bottle size, cap type and filling temperature.
Layout Design
Plan filling block, packing line, syrup room, water treatment, utilities and operator space.
Manufacturing & FAT
Assemble, test and document the line before shipment with FAT records and videos.
Installation & Training
Support commissioning, operator training, maintenance guidance and spare parts planning.
What you receive before placing an order
Documents and plans prepared before ordering.
Machine Configuration
Recommended equipment based on liquid, container and target capacity.
- Core filling machine
- Upstream and downstream equipment
- Optional automation level
2D / 3D Plant Layout
Layout for production flow, operators and utilities.
- Machine footprint
- Conveyor direction
- Maintenance space
Utility Requirement
Power, air, water, steam or cooling conditions.
- Voltage and frequency
- Compressed air
- Water and drainage
FAT Test Plan
Factory acceptance test plan before shipment.
- Running test
- Inspection video
- Packing and shipment check
Installation Plan
Commissioning plan after delivery.
- Installation guidance
- Debugging checklist
- Operator training
After-sales Support
Support for stable operation and upgrades.
- Spare parts list
- Troubleshooting
- Upgrade planning
Service planning by bottling project
Different liquids and containers need different process planning.
Water Bottling Plant
Water treatment, bottle blowing, filling, labeling, packing and palletizing layout.
Carbonated Drink Line
Syrup room, carbonation, isobaric filling, cooling or warming and packing plan.
Juice Hot Filling Line
Sterilization, hot fill, cooling, CIP and container compatibility review.
Oil & Detergent Line
High-viscosity filling, anti-drip nozzles, capping, labeling and carton packing.
Test records and project evidence
FAT clips, test records, installation photos and project cases.
FAT Test Video
Line running before shipment, including filling stability, capping result, control panel and conveyor connection.
Component Inspection
Close-up images and checklists for valves, electrical configuration, frame quality and safety guards.
Project Case Records
Country, product, container, capacity, machine scope and project result.
Installation Support
Installation steps, operator training material, spare parts plan and troubleshooting guide.
Information to prepare before inquiry
Prepare these details before requesting a bottling line quote.
Frequently asked questions
Can Modern Machinery design a bottling plant layout?
Yes. The technical team can prepare 2D or 3D layout direction based on liquid type, container, capacity, factory dimensions and packing requirements.
What is included in FAT testing?
FAT can include machine running test, control panel check, filling or packing performance verification, inspection records, photos and videos before shipment.
What information is needed before planning a production line?
Prepare liquid type, formula basics, container size, cap type, target capacity, factory dimensions, voltage, utility conditions and packing method.
Does technical service include installation and training?
Yes. Installation guidance, commissioning support, operator training, maintenance notes and spare parts planning can be included depending on project scope.
Can an existing bottling line be upgraded?
Yes. Upgrade planning reviews bottleneck equipment, conveyor layout, packing capacity, utility reserve and automation needs.