Product Category

Craft Brewing Beer Bottling Equipment

Model: PXGFD

Craft Brewing Beer Bottling Equipment

We supply complete solution of beer bottling and packing line from A to Z, which includs Automatic bottle rinsing filling capping machine, Beer Pasteurization Tunnel, Air dryer, Automatic labeling machine, Automatic carton packing machine and the whole factory conveyor system.

Beer bottling line layout

Beer Bottling Equipment

Beer bottling equipment

Features:

1. Using the conveyor sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier.

2. Bottles transmission adopt clip bottle neck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough.

3. The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution.

4. High-speed balanced pressure flow valve filling valve, filling fast, filling accurate and no liquid spit out.

5. Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains.

6. Host adopt advanced PLC automatic control technology, the key electrical components from famous company such as Japan Mitsubishi, France Schneider, Germany Siemens

7. The CIP cleaning solution gets in contact with every part and interstice of the valves.

8. With Central greasing system.

9. Replacement valves are adopted.

Beer bottling equipment rinsing part Beer bottling equipment filling part Beer bottling equipment capping part

Bottle Rinsing Part

Bottle Filling part

Bottle Capping part

The complete bottling process will be as below:

① The replacement valve is linking with air drum, CO2 inside air drum enter bottles via replacement valve. The gas inside bottle now is mixing with CO2 and air.

② Air exhausting valve is opened via cam to exhaust the mixed gas.

③ Refill CO2 into bottle again.

④ Operation valve open, after the pressure between cylinder and bottle is equal, the filling process starts, when the filling level reach air returning pipe, filling stops, filling valves closed.

⑤ After filling process finishing, before filling valves leaving bottles, air exhausting valve exhaust extra gas, then filling valves leave bottle neck, bottling process finishes.

Model
PXGFD18186
PXGFD24248
PXGFD32328
PXGFD404010
PXGFD505012
Capacity (B/H)
3000-4000
5000-6000
7000-8000
8000-9000
9000-11000
Heads of rinsing,filling&capping
18-18-6
24-24-8
32-32-8
40-40-10
50-50-12
Suitable bottle height(mm)
160-340
Suitable bottle diameter(mm)
Φ50-Φ100
Wash water pressure(Mpa)
0.25-0.3
Filling way
& Pressure equality filling&Twotimes vacuumized
Filling temperature(℃ )
0-5
Filling pressure(Mpa)
0.15-0.5
Main power(kw)
3
4
7.5
11
Total power(kw)
3.18
4.18
7.68
Overall dimensions(mm)
3010×2010×3260
3280×2420×3200
4430×2880×3200
4650×3200×3200
4987×3846×3200
Weight(kg)
3800
5000
6800
8800
11000

 

Service

MODERN MACHINERYoffers engineer to assist you in installing your bottling machine. Upon installation of your equipment or line, the engineer stays on-site to watch your new equipment run smoothly and train your operators. Even after our specialist leaves your plant, we are ready to give you timely, courteous service when you need it.
Our engineer offers the following services:

1. Installation of equipment or packaging line at the customer’s plant
2. Coordinate schedule with mechanics to perform changeovers and preventive maintenance activities
3. Perform mechanical adjustments (if needed) on equipment and packaging line to optimize equipment’s performance
4. Resolve equipment issues
5. Provide on-site training on all assigned procedures

Related Product