FJ
Modern
We supply complete solution of beer filling and packing line from A to Z, which includs Automatic bottle rinsing filling capping machine, Beer Pasteurization Tunnel, Air dryer, Automatic labeling machine, Automatic carton packing machine and the whole factory conveyor system.
Fermentation Tank available from 1 Barrel to 100 Barrels with an average 25% Head Space. All tank have a Dish top, Cylinder body & 60 /70° Cone Bottom. Certified stainless steel material for all tanks, with 100% TIG welded joints and seams with sanitary interior polish. Dimple Plate jacket for Glycol cooling & high efficient Polyurethane foam insulated. All tanks use Tri-clamp connections, are designed for up to 14.7 PSI and tested at 30 PSI. We can custom fabricate any tank to meet your brewery’s space and height restrictions.
Function: Wort fermentation or maturtion.
Component: It is composed of Shadowless manhole, Pressure relief valve, Aseptic valve, Pressure gage, Rotate racking arm, Butterfly valve, Pressure relief valve and so on. It is the third part of micro beer brewing equipment.
Types: 50L-10000L, and even bigger volume.
Cooling method: Ice water belt or glycol cooling jacket around both top and bottom.
Design pressure is 0.3MPa; Working pressure is 0.15MPa.
Material: Stainless steel 304/316/316L.
Service
MODERN MACHINERYoffers engineer to assist you in installing your bottling machine. Upon installation of your equipment or line, the engineer stays on-site to watch your new equipment run smoothly and train your operators. Even after our specialist leaves your plant, we are ready to give you timely, courteous service when you need it.
Our engineer offers the following services:
1. Installation of equipment or packaging line at the customer's plant
2. Coordinate schedule with mechanics to perform changeovers and preventive maintenance activities
3. Perform mechanical adjustments (if needed) on equipment and packaging line to optimize equipment's performance
4. Resolve equipment issues
5. Provide on-site training on all assigned procedures
Filling machine machining center
Container loading and shipping
We supply complete solution of beer filling and packing line from A to Z, which includs Automatic bottle rinsing filling capping machine, Beer Pasteurization Tunnel, Air dryer, Automatic labeling machine, Automatic carton packing machine and the whole factory conveyor system.
Fermentation Tank available from 1 Barrel to 100 Barrels with an average 25% Head Space. All tank have a Dish top, Cylinder body & 60 /70° Cone Bottom. Certified stainless steel material for all tanks, with 100% TIG welded joints and seams with sanitary interior polish. Dimple Plate jacket for Glycol cooling & high efficient Polyurethane foam insulated. All tanks use Tri-clamp connections, are designed for up to 14.7 PSI and tested at 30 PSI. We can custom fabricate any tank to meet your brewery’s space and height restrictions.
Function: Wort fermentation or maturtion.
Component: It is composed of Shadowless manhole, Pressure relief valve, Aseptic valve, Pressure gage, Rotate racking arm, Butterfly valve, Pressure relief valve and so on. It is the third part of micro beer brewing equipment.
Types: 50L-10000L, and even bigger volume.
Cooling method: Ice water belt or glycol cooling jacket around both top and bottom.
Design pressure is 0.3MPa; Working pressure is 0.15MPa.
Material: Stainless steel 304/316/316L.
Service
MODERN MACHINERYoffers engineer to assist you in installing your bottling machine. Upon installation of your equipment or line, the engineer stays on-site to watch your new equipment run smoothly and train your operators. Even after our specialist leaves your plant, we are ready to give you timely, courteous service when you need it.
Our engineer offers the following services:
1. Installation of equipment or packaging line at the customer's plant
2. Coordinate schedule with mechanics to perform changeovers and preventive maintenance activities
3. Perform mechanical adjustments (if needed) on equipment and packaging line to optimize equipment's performance
4. Resolve equipment issues
5. Provide on-site training on all assigned procedures
Filling machine machining center
Container loading and shipping